MW Youth Space Construction

MW Youth Space Construction

On May 29, 2010, the Family Life Church council unanimously approved the funding and construction for a new (existing) space for the Most Wanted Youth Group.  Located in the lower level of the Washington Street facility, this area (which is almost as large as the previous square footage of the church sanctuary on Chestnut Street) will be completely gutted of existing materials and a new space built.

Highlights of the new space include:

-16′ Coffee bar with sink, appliances
-Full size Pool Table
-Performance stage with sound system and stage lighting
-Seating and bistro-type tables for gatherings and meetings
-New electrical panel/system to provide ample power for space
-Capability for space to be used as sanctuary overflow area or meeting room via video/audio feed

The construction officially began with the removal of the wall that was located in the center of the room.  This essentially created one large room out of two existing rooms.  The next steps will be removing the existing tile flooring and replacing with brand new tile, and building the stage.